欧美激情久久久久久,人妻久久精品天天中文字幕,国产精品无码色一区二区三区按摩 ,日韩中文无码有码免费视频

馬來(lái)西亞低壓布線(xiàn)手冊3

本手冊是2013年由國際銅業(yè)協(xié)會(huì )東南亞區馬來(lái)西亞電氣專(zhuān)家,結合馬來(lái)西亞當地建筑電氣規范和IEC標準編寫(xiě)的,是對低壓電氣布線(xiàn)的指導說(shuō)明。手冊只有英文版,僅供大家學(xué)習參考。


版權歸國際銅業(yè)協(xié)會(huì )所有

馬來(lái)西亞低壓布線(xiàn)手冊3

說(shuō)明:本手冊共分為8個(gè)大章節。本文是第四個(gè)大章節之4.1、4.2:


4 Earthing System

4.1 Earth Systems in an Installation

Earthing systems in an electrical installation can be identified as follows:


a.

Electrical system earth; defined in Part 1; Section 312 and Part 5-54 (which will be covered in this handbook).

b.

Equipotential earth (for protection) covered in Part 4-41, Part 4-44 and 5-54 (which will not dealt with in this handbook).

c.

Equipotential earth (for EMC) covered in IEC61000-5-2 “Electromagnetic compatibility (EMC)”; Part 5: Installation and mitigation guidelines – Section 2: Earthing and cabling” (which will not dealt with in this handbook).


4.2 Earthing System Defined in IEC 60364; Part 1, 312

System earth in an installation is defined in Part 1; 312 1st

From the above, three main earthing system types can be identified.

Note: If isolating transformer (iTx) has primary of Δ then TN-C system is used. If iTx has primary of Y, then TN-S system is used.

a.

TT System – where the source neutral is earthed and the frame of the load is independently earthed. TT system has 4 cables comprising 3P + N. TT system requires independent earth at both ends of the connections.

b.

TN System – where the source neutral is earthed and the frame of the final load is earthed through a protective conductor (PE) which connects back to “source” earth. TN has two sub systems:

(i) TN-C System – where the frame earth is linked via the neutral to the source earth,creating a combined PE and Neutral (PEN) conductor. TN-C system has 4 cables comprising 3P + PEN.

(ii) TN-S System – where the frame earth is connected through a separate ‘earth continuity conductor’ called the ‘Protective Earth’ or PE. TN-S system has 5 cables comprising 3P + N + PE.

TN system requires only one earth point at source.

c.

IT System – where the source neutral is unearthed and the frame of the final load is independently earthed. IT system has 3 cables comprising 3P. An earth point would be required at termination end.


Note: “IN” system is topographically not possible (frame earthing linked back to source neutral earth is not possible when source neutral is unearthed). An “IN” system would in effect be a completely unearthed installation and IS NOT ALLOWED for safety reasons.


圖片加載中...

在線(xiàn)留言

◎歡迎您的留言,您也可以通過(guò)以下方式聯(lián)系我們:

◎客戶(hù)服務(wù)熱線(xiàn):021-51095123

◎郵箱:xin021@126.com

展開(kāi)